3414 Polk Co Bridge

Wednesday, January 24, 2018

Intermediate cap build 1 24 2018


9:24am- Building rebar steel frame for the intermediate bent cap



10:18am- Cutting I Beam’s to length for intermediate bent caps.


11:10am- Rebar cage for intermediate bent 3 cap set in place.


Posted by Lee at 6:03 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: 1 24 2018

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Contributors

  • Great River
  • James Sutton
  • Lee

Blog Archive

  • ▼  2018 (58)
    • ►  May (10)
    • ►  April (11)
    • ►  March (15)
    • ►  February (8)
    • ▼  January (14)
      • Pour cap at #4 bent 1 31 2018
      • Pour caps 1 30 2018
      • Frame bent 4 1 29 2018
      • Build working pads 1 25 2018
      • Intermediate cap build 1 24 2018
      • Forms intermediate bent 1 23 2018
      • Jobsite clean up 1 22 2018
      • End bent 1 pile driving 1 11 2018
      • Driving pile at end bent 4 1 10 2018
      • Forming wall at bent 3. 1 9 2018
      • Attach steel for bent 3. 1 8 2018
      • Excavating East approach 1 4 2018
      • Excavating for East app 1 3 2018
      • Excavating for East approach 1 2 2018
  • ►  2017 (16)
    • ►  December (15)
    • ►  November (1)
Simple theme. Powered by Blogger.