9:56am- Placed 8 rock ditch checks at the South West approach
10:10am- Setting more riprap in place
10:15am- Grouting the South side of corral wall
11:35am- Continue to set riprap at several locations
1:11pm- moving riprap at the South side of East approach
1:55pm- Excavating for the slab approaches
2:43pm- Applying base for approach slab