3414 Polk Co Bridge

Showing posts with label 12 7 17. Show all posts
Showing posts with label 12 7 17. Show all posts

Thursday, December 7, 2017

Excavation 12 7 17


10:51am - Continue clearing and grubbing

11:17am - Excavating for bent 2



1:33pm- Demoing existing bridge

2:18pm- Removing structural steel pile from delivery truck.



Posted by Lee at 2:47 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: 12 7 17
Older Posts Home
Subscribe to: Posts (Atom)

Contributors

  • Great River
  • James Sutton
  • Lee

Blog Archive

  • ▼  2018 (58)
    • ▼  May (10)
      • Guard Rail 5 17 18
      • Guard rail 5 16 18
      • Riprap 5 15 18
      • Approach slabs 5 14 18
      • Riprap and slab approach 5 10 18
      • riprap 5 9 18
      • Bridge clean up 5 8 18
      • Site visit, roadway compaction
      • North side corral wall 5 2 18
      • South Corral wall 5 1 18
    • ►  April (11)
    • ►  March (15)
    • ►  February (8)
    • ►  January (14)
  • ►  2017 (16)
    • ►  December (15)
    • ►  November (1)
Simple theme. Powered by Blogger.