Monday, December 18, 2017

Site visit, Poured Bent 2 Wall

 Contractor was making final adjustment to the forms on Bent 2 wall

 Checked rebar and form work, all checked good.


 Contractor has started installing the 66" RCP




 Started pouring Concrete at 1:18, I tested concrete: Slump 41/2", Air 3.5/5. Air was low on all trucks. Had to check all truck, overall pour went good.