3414 Polk Co Bridge

Showing posts with label 2-20-2018. Show all posts
Showing posts with label 2-20-2018. Show all posts

Tuesday, February 20, 2018

Site visit, Checked site after rain, No work being done.

 No work today due to rain.
 Bypass road is being washed away by rain waters












Posted by Great River at 9:10 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: 2-20-2018
Older Posts Home
Subscribe to: Posts (Atom)

Contributors

  • Great River
  • James Sutton
  • Lee

Blog Archive

  • ▼  2018 (58)
    • ▼  May (10)
      • Guard Rail 5 17 18
      • Guard rail 5 16 18
      • Riprap 5 15 18
      • Approach slabs 5 14 18
      • Riprap and slab approach 5 10 18
      • riprap 5 9 18
      • Bridge clean up 5 8 18
      • Site visit, roadway compaction
      • North side corral wall 5 2 18
      • South Corral wall 5 1 18
    • ►  April (11)
    • ►  March (15)
    • ►  February (8)
    • ►  January (14)
  • ►  2017 (16)
    • ►  December (15)
    • ►  November (1)
Simple theme. Powered by Blogger.